Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2448.7
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Sep 15, 2022     45-13 Cabin door and transparencies Step Planearound - (3 hours) Category: Fuselage
Drilled two holes to allow safetying the pins. Assembled the latch system in place according to instruction. Insertion of pinned rack to mid pin through the holes in the door handle cavity. Installed rack through holes for the gearbox. Waiting for missing parts (forward pin both doors)
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.